loading

Nanjing Efg Co., Ltd. Has specialized in Fiberglass Materials Supplies Since 2003.

Home   |   PRODUCT   |   Polyester Non-woven Materials   |   Reinforced polyester mat   |  

Fiberglass mesh reinforcement polyester mat for paving 120g/m2, 130g/m2, 150g/m2

这里可以自定义设置
Fiberglass mesh reinforcement polyester mat for paving 120g/m2, 130g/m2, 150g/m2
B站不支持收货地址
B站不支持库存规格
Packing:
Every roll in plastic film without pallet, 115rolls/40’HQ
Delivery:
Cargo will be loaded into container in factory, then be delivered to the sea port, finally be shipped to Customer’s port by MSK, MSC, CMA, COSCO, YANGMING, APL, etc.
Payment:
LC, T/T, CAD, PAYPAL, WESTERN UNION, ETC.
Loading Quantity:
Standard export loading
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容

 NJEFG

Fiberglass mesh reinforced polyester mat for paving 120g/m2, 130g/m2, 150g/m2

Fiberglass mesh reinforced polyester mat is polyester mat reinforced by fiberglass scrim or mesh. Because of the high tensile strength, high tear strength, corrosion resistance and easy soakage by bitumen, this material is used as excellent paving material for such as high-way, airport runway, etc., at the same time, it also can be used as substrate material for APP or SBS modified bitumen membrane, oil pipe wrapping material, geotextile material, reinforcement of sports floors. The tensile strength of the fiberglass mesh reinforced polyester mat is adjustable by changing the mesh size of all yarns to meet different requirements. 

 

【CHARACTERISTICS】                                   

1. High tensile strength, high tear strength, corrosion resistance, aging resistance.

2. Easy soakage by bitumen

3. Easy to operation 

4. Low cost

Item No. Unit PF120-4X4-FB PF120-5X5-FB PF130-6X6-FB PF150-7X7-FJ
Area Weight g/m2 120 120 130 150
Width mm 1000 1000 1000 1000
Length m 1250 1250 1200 1100
Tensile Strength MD N/5CM 300 400 450 500
Tensile Strength CD N/5CM 100 200 250 450
Roll Diameter mm 770 770 770 770
Core Diameter mm 76 76 76 76
Moisture % <2.5 <2.5 <2.5 <2.5

Remark: 1. The technical data above is for reference only
2. Any special size can also be supplied according to customers’request

这里可以自定义设置
Instruction to use the polyester fiberglass paving mat

◆ Remove dirt, gravel and dust from the pavement to assure good adhesion between asphalt and pavement. 

◆ If the road is damaged, it must be repaired to make the surface of the road hard and smooth.
◆ For a good result, the asphalt binder that will be used to adhere the Paving Mat to the road must be hot asphalt, but not emulsified asphalt.
◆ The temperature of hot asphalt should be between 163℃ and 204 ℃.
◆ When the hot asphalt covered the road, the Composite Paving Mat must be overlaid onto the hot asphalt before the asphalt lose it’s mobility so as to assure the mat fully soaked by asphalt and effectively provides a moisture barrier.  

◆On installation of the Composite Paving Mat, the air temperature must be higher than 4 ℃.


In order to achieve optimal results, here we provide some Notes on installation of Composite Paving Mat:
◆Composite Paving Mat must be installed on hot asphalt. We recommend the following asphalt. AC-20; PG64-22; AR8000 +, or asphalt with penetrate rates 60-80. In extremely hot summer, we recommend to use asphalt with high viscosity, such as AC-30; PG67-22; AR8000 +, or asphalt with penetrate grade 40-60.
◆ The best ratio of asphalt is 1.1 liters / square meters paving mat, but subject to project site situation during the installation, the ratio can be between 1.0-1.3 liters / square meters. According to different area weight of the Composite Paving Mat, the ratio of asphalt should be adjusted accordingly. During the asphalt delivery, we do not advise to heat the asphalt above to a temperature higher than 204 ℃, because this would hinder the pre-mature of liquid asphalt. 
◆ Handle the Composite Paving Mat with care during the installation, the paving mat might be damaged or it may cause bad result if the paving mat drop down from the installation machine.

◆During the installation, if it forms a stripe bigger than 2.5cm in any direction, the stripes must be cut and overlaid, and the two layers of paving mat must be fully covered by asphalt so as to assure the two layers of paving mat fully soaked in the hot asphalt. Use roller to press the paving mat or use brush to clear out bubbles in the paving mat to ensure the paving mat fully adhered to the road. When covering the hot asphalt to the road, the width of asphalt should be 4 inch more than the width of paving mat. Since the paving mat can not be curved, for the winding area of the road the paving mat can be cut into several pieces and be installed to the road manually or mechanically.  

◆For the connection of two pieces of paving mat: the two pieces of paving mat must be overlapped together. In the longitudinal direction the width of overlapped area must be at least 10.2cm; and in the lateral direction, the width of overlapped area must be at least 5.1cm.

◆ If the installation machine or other vehicles have to drive on the paving mat, it should not turn directions frequently nor suddenly so as to avoid damaging the paving mat. Do not scatter sand or other object on the paving mat; to avoid asphalt sticking to the tire of the machine, do not minimize the ratio of bitumen.

 

Chat Online 编辑模式下无法使用
Leave Your Message inputting...